The quality standard of the operation of electric gourd

2024-02-23

Z

Quality requirements of electric gourd rail installation technology: After the Gongfang to the cargo material is qualified, check the deformation of the transportation process. When the deviation is exceeded, it is necessary to correct it. The actual central line after installation is not greater than 5mm on the horizontal position of the installation benchmark line. The limit device and buffer device on the rail should meet the requirements of the specifications.

The process of processing before the installation of electric gourds: The buffer device at both ends of the track or the steel must be installed well; whether the support point of the industrial steel is constructed according to the figure, and whether the connection is firm; whether the stitching of the work steel meets the specification requirements. The lower wing edge must be polished smoothly without a truck wheel.

Check the inspection before the electric gourd: carefully check the electrical gourd rising some reducer before hanging, whether to infuse the lubricant in accordance with the regulations, and whether the walking part is not to note the grease; carefully check whether the electrical control box is wiring according to the electrical map, and the test is promoted. The insulation status of the motor and walking motor; check whether the fixed end of the steel wire rope is tight and whether the block is wedded; check whether the control button wiring is correct, the insurance rope of the fixed button must be installed; Zebra pattern, the hook insurance device is complete; the steel wire rope and the roll tube must have three plates per end, and the bolt must be fastened; the exhaust device is equipped with correctly, the rise and falling limit switch is installed correctly.