Building climbing rack electric gourd is an electric gourd that plays an important role in the construction of the national economy. The establishment of each high -rise building is inseparable from the building climbing electric gourd. Building climbing rack electric gourds are widely used in high -rise overall climbing racks. The installation technology is as follows: Preparation before installation: Before installation of the external climbing frame, you should read the design drawings in detail. Liang, building climbing gourd. And make bolts in the design location. The position of the bolt drilling in each layer needs to be consistent, so that the bracket can be stable and vertical, and the error is not allowed to be higher than or less than 10mm. At the same time, processing of basic parts such as wire rope, bearing, beam, and fastening. It should be noted that because the height of the upper floor of the high -rise building is inconsistent with the group floor, it should be installed from the position of the top of the skirt when connecting the price of the external card, which can reduce the high error. Overall installation: When the outer climbing frame is installed as a whole, the infrastructure of the scaffold should be set up first, and you can choose to use ordinary steel pipes. Then install the bearing support on the infrastructure, and the fixed bolt is located on the inner side of the bearing trust. The bolt is fixed with the outer beam, and the outer part of the bearing support is fixed with the front beam on the upper layer. This can achieve dual guarantees. When the bearing support is erected on the main bracket, you need to pay attention to it. The vertical steel pipe should be installed first. Then set up a bearing truss, and the connection of the structure is completed by buckle. During the construction process, it is necessary to note that the distance between the tube of the beabetic truss and the bottom string tube is 3cm. Improve equipment installation: Reserve bolts drilling on each layer of wall, and clean up gravel in the hole to ensure that the bolts can be firmly combined with the emotional surface. Then install the lip support and increase the tie rod. The intensity of the increase in the tie rod must reach about 20MPa. After fixing the steel frame, you can install the building climbing rack electric gourd. The motor in each position needs to be numbered. The number is consistent with the specific height number of the climbing frame. During the chain installation, twisting, flipping, etc. are not available, and the pollution oil on the chain is removed to install a rain cover for the motor.